Contact Us | 1-616-844-4211

1) Place the starting strip between the outer studs/markings in the desired location and insert a screw in a middle stud. The slat wall has a groove in it to start the tip of the screw. No pre-drilling is required (except in concrete applications).

2) Scribe a level line horizontally where you want your Organizer to start. Identify the stud locations and mark or draw a line 47” down.

3) Level the starter strip and insert the other middle screw.